Completed / Commercial / London
Scalpel Tower
Project Summary
Developer/Client
WRBC Development UK Ltd
Main Contractor
Skanska UK Ltd
Architect
KPF
Structural Engineer
Arup
MEP Consultants
Arup
MEP Contractor
Skanska Raliegh
Height of Scalpel Tower
190m
Commerical space over 35 levels
Over 500,000 Sq. ft
Asset tagged components
22,688
“This project was probably one of the first ‘BIM’ projects that we had worked on after many years working on 3D modelled projects, and it was great to experience the benefits of working in full collaboration with the design team through a common data environment. I believe the use of BIM truly improved the delivery of this project for quality, time, accuracy and waste management. Although the project went well there was still many challenges to overcome, such as the HV cables throughout the basement having to be installed as the lowest service due to installation sequencing, this presented problems on how to protect the cables if there was a fire, and how to protect the cables should services above collapse in those circumstances. Another issue was that there were AHU’s on every floor in very small plantrooms and the units had to be designed with heating / cooling coils which could pivot as they were withdrawn, as there wasn’t the space to fully withdraw the coils in the usual manner. They say every day is a learning experience and I certainly gained a lot of knowledge from this project which I have benefited from on future projects”.
Matt McGuire Director
“I am thrilled to share my wonderful experience with this special business that I had the pleasure of working with on ‘The Scalpel Tower’ 52 Leadenhall London. We found BIMTech Engineering to be professional, diligent, and problem solving on any aspects delivering cutting-edge design and innovative ideas that guided the smooth transition from Pre-Construction to Construction. The project team was always available to answer my questions, address any concerns, and provide timely support. BIMTech Engineering were knowledgeable and understanding of our needs and extremely proactive in delivering an excellent product. First class team and business. We look forward to continuing our working relationship in the future.”
Chris Rust Skanska Raliegh