Project Summary

Developer/Client Yoo Capital and Deutsche Finance International
Main Contractor LOR
Architect Adamsons, EPR & HLM
Structural Engineer Robert Bird
MEP Consultants Ramboll
MEP Contractor CHT
Olympia Development- Emberton House
“This project is unique due to its integration of new construction with the preservation of the historic façade. It features the creation of a new school and a hotel spanning nine levels, blending modern functionality with heritage. The high level of Design for Manufacture and Assembly (DFMA) integrated into the project, allowed us to streamline construction processes and improve efficiency, making the project both innovative and sustainable."

Mark Cain BIM Manager

Our Services

BSI Kitemark ISO 19650-2

BIM Level 2 Compliant

Developed by the BIM Task Group – a government initiative – Level 2 BIM modelling standards are a major step forward on the journey toward the digitalisation of the built environment.

Learn more

Virtual Coordination

Effective coordination is critical to the BIM process. The cycle starts at the pre-design stage and continues, with the help of 3D, through detailed design during which collaboration is the key.

Learn more
Existing Environment Assets

Laser Scanning

Accurate plans and information are essential to BIM – but there are times when limited information is available. Under these circumstances we use 3D laser scanning of an existing building or site.

Learn more
Installation Standard Drawings

Drawing Production

By providing both MEP services and MEP drawings, we work as an integrated, pro-active team, engaging with our clients to help at both the conceptual and construction-status stages of a project.