Completed / Healthcare / Bedfordshire
Luton & Dunstable University Hospital Redevelopment
Project Summary
Developer/Client
Bedfordshire Hospitals NHS Foundation Trust
Main Contractor
KIER Construction
Architect
Murphy Philipps
Structural Engineer
Perega
MEP Consultants
Troup Bywaters + Anders
MEP Contractor
KIER Mechanical & Electrical
Man days to produce the MEP services model & drawing sheets
Over 1000
Successfully synced Project Revit files to cloud
15,400
Trade drawings per floor, including pneumatic tube and medical gas layouts
13
No. of status A drawings issued for Construction
264
“This project was really challenging due to the amount of services and the technical requirements of specialist trades. As I believe growth can be reached only through challenges, I think we as a team learned a lot how to successfully deliver the project. During modelling and sheet production, service layouts were intensively monitored and extensively commented by KIER M&E design team which often included changes in coordination to meet installation preferences. Applying changes in the model required good understanding and problem solving from all team members. Utilising the knowledge we gained during covid lockdowns, 100% of project workflow took place in virtual space including the modelling, meetings, sheet commenting, issue resolution.
Zoltan Aradi BIM Manager- Hungary