Completed / Educational Residential / Greater Manchester

Circle Square

https://bimtech-eng.com/wp-content/uploads/2024/10/Projects_Circle_Square-1304x1500.jpeg

Project Summary

Developer/Client Bruntwood & Select Property Group
Main Contractor SISK
Architect Feildon Clegg Bradley Studios
Structural Engineer Curtins
MEP Consultants CWC
MEP Contractor SES
High quality student apartments 1,100
Commercial office space 1.2 million sq. ft.
Bathroom pods installed for the Student accommodation alone 1,206
Optimised to understand the logistics of the build sequencing on building 7/8 4D scheduling
We engaged BIMTech Engineering to assist with a review of our construction programme on a typical floor by using 4D model sequencing. Their understanding of the construction industry made the process seamless and the results of the 4D model proved invaluable. From the model and report we were able to see potential sequencing and logistic issues before they became an issue on site. This enabled us to re-visit the programme and make the necessary changes to resolve the issues. This has opened our eyes to the benefit of 4D planning.

Chris Parker Senior Building Services Manager - SISK

Circle Square proved to be a great project for BIMTech to be involved with, as we worked on many different buildings within the development for many different clients, being able to experience the project through all the design stages: Working with Crookes Walker Consultants for buildings 5/6 & 7/8 at design Stages 3 and 4. Working with SES on building 9 for Stages 4, 5 & 6 taking the model and drawings from technical design through to construction and hand over. Working with Sisk at Stage 5 to produce a 4D sequencing animated model & report aligning to their programme of construction

Matt McGuire Director - BIMTech Engineering

Our Services

BSI Kitemark ISO 19650-2

BIM Level 2 Compliant

Developed by the BIM Task Group – a government initiative – Level 2 BIM modelling standards are a major step forward on the journey toward the digitalisation of the built environment.

Learn more

Virtual Coordination

Effective coordination is critical to the BIM process. The cycle starts at the pre-design stage and continues, with the help of 3D, through detailed design during which collaboration is the key.

Learn more
Existing Environment Assets

Laser Scanning

Accurate plans and information are essential to BIM – but there are times when limited information is available. Under these circumstances we use 3D laser scanning of an existing building or site.

Learn more
Installation Standard Drawings

Drawing Production

By providing both MEP services and MEP drawings, we work as an integrated, pro-active team, engaging with our clients to help at both the conceptual and construction-status stages of a project.

Learn more
01