In Progress / Commercial / London

Holborn Viaduct

https://bimtech-eng.com/wp-content/uploads/2025/02/Holborn_Viaduct_Render-1500x1000.png

Project Summary

Developer/Client Royal London Asset Management Limited
Main Contractor Multiplex
Architect PLP Architecture
Structural Engineer Heyne Tillet Steel
MEP Consultants Hilson Moran
MEP Contractor Dornan
Sq ft 405,000
Contract value £167 million
Storeys 14
Tonnes of steel 3,200+

Our Services

BSI Kitemark ISO 19650-2

BIM Level 2 Compliant

Developed by the BIM Task Group – a government initiative – Level 2 BIM modelling standards are a major step forward on the journey toward the digitalisation of the built environment.

Learn more

Virtual Coordination

Effective coordination is critical to the BIM process. The cycle starts at the pre-design stage and continues, with the help of 3D, through detailed design during which collaboration is the key.

Learn more
Existing Environment Assets

Laser Scanning

Accurate plans and information are essential to BIM – but there are times when limited information is available. Under these circumstances we use 3D laser scanning of an existing building or site.

Learn more
Installation Standard Drawings

Drawing Production

By providing both MEP services and MEP drawings, we work as an integrated, pro-active team, engaging with our clients to help at both the conceptual and construction-status stages of a project.

Learn more
01
04