In Progress / Healthcare / Belfast

Belfast Children’s Hospital

https://bimtech-eng.com/wp-content/uploads/2025/06/1740035096_rvh-new-childrens-hospital-vp03-draft6-gigapixel-low-resolution-v2-1x.png

Project Summary

Developer/Client Belfast Health & Social Care Trust
Main Contractor Graham Construction
Architect AECOM
Structural Engineer AECOM
MEP Consultants White Young Green
MEP Contractor Nugent
Contract Value £671m
Floors 10
Emergency department capable of catering for up to 45,000 children per year

Our Services

BSI Kitemark ISO 19650-2

BIM Level 2 Compliant

Developed by the BIM Task Group – a government initiative – Level 2 BIM modelling standards are a major step forward on the journey toward the digitalisation of the built environment.

Learn more

Virtual Coordination

Effective coordination is critical to the BIM process. The cycle starts at the pre-design stage and continues, with the help of 3D, through detailed design during which collaboration is the key.

Learn more
Existing Environment Assets

Laser Scanning

Accurate plans and information are essential to BIM – but there are times when limited information is available. Under these circumstances we use 3D laser scanning of an existing building or site.

Learn more
Installation Standard Drawings

Drawing Production

By providing both MEP services and MEP drawings, we work as an integrated, pro-active team, engaging with our clients to help at both the conceptual and construction-status stages of a project.

Learn more
01
04